Difference between revisions of "Orbital Contingency Test Flight"
Jump to navigation
Jump to search
Lafayette1 (talk | contribs) |
Lafayette1 (talk | contribs) |
||
Line 25: | Line 25: | ||
| shuttle = Patriot | | shuttle = Patriot | ||
| launch_pad = [[SLC-7]] | | launch_pad = [[SLC-7]] | ||
− | | launch = | + | | launch = NET March 10, 2010 |
− | | landing = | + | | landing = TBD |
| duration = TBD | | duration = TBD | ||
| inclination = 90° | | inclination = 90° |
Revision as of 01:29, 14 October 2009
This article or section documents a scheduled or expected spaceflight. Details may change as the launch date approaches or more information becomes available. |
| ||||||||||||||||||||||||||||||||||||
|
Terra Nova crew
Position | Astronaut | |
---|---|---|
Commander | Frank Rosewood Third spaceflight | |
Pilot | Anatoly Orlav Third spaceflight | |
Mission Specialist 1 | Daniel Baxter Sixth spaceflight | |
Mission Specialist 2 | Thomas Kincaid Second spaceflight | |
Mission Specialist 3 | Frank Whitaker Second spaceflight |
Patriot crew
Position | Astronaut | |
---|---|---|
Commander | Harold Hamilton Seventh spaceflight | |
Pilot | David Sanders Fifth spaceflight | |
Mission Specialist 1 | Ixy Comeaux Seventh spaceflight |
Mission parameters
- Mass:
- Perigee:
- Apogee:
- Inclination:
- 90°
- Period:
- 87.6 minutes
Docking
- First docking: July 17, 1975 - 16:19:09 UTC
- Last undocking: July 19, 1975 - 15:26:12 UTC
- Time docked: 1 day, 23 hours, 07 minutes, 03 seconds