Difference between revisions of "Shuttle Cheat Sheet"
Lafayette1 (talk | contribs) |
Lafayette1 (talk | contribs) |
||
Line 32: | Line 32: | ||
=== STS-23W (''Liberty'') === | === STS-23W (''Liberty'') === | ||
− | February 7-27 , 2011. ''Bravo'' construction flight (BCF-6). Delivery of the [[Wikipedia:Centrifuge Accommodations Module|Centrifuge Accommodations Module]]. Module to be attached to port hatch of ''Clarity''. Orion capsule expected to be launched for emergency use. Will be positioned at the nadir hatch of ''Clarity'' at PMA-3. | + | February 7-27, 2011. ''Bravo'' construction flight (BCF-6). Delivery of the [[Wikipedia:Centrifuge Accommodations Module|Centrifuge Accommodations Module]]. Module to be attached to port hatch of ''Clarity''. Orion capsule expected to be launched for emergency use. Will be positioned at the nadir hatch of ''Clarity'' at PMA-3. |
<!-- ET is aft, shuttle docking area is forward. Starboard and port are based on this.--> | <!-- ET is aft, shuttle docking area is forward. Starboard and port are based on this.--> | ||
Revision as of 22:45, 28 February 2011
Contents
- 1 ISA Western (STS-**W) notation
- 1.1 STS-13W (Patriot)
- 1.2 STS-14W (Liberty)
- 1.3 STS-15W (Constitution)
- 1.4 STS-16W (Intrepid)
- 1.5 STS-17W (Liberty)
- 1.6 STS-18W (Terra Nova)
- 1.7 STS-19W (Patriot)
- 1.8 STS-20W (Liberty)
- 1.9 STS-21W (Constitution)
- 1.10 STS-22W (Patriot)
- 1.11 STS-23W (Liberty)
- 1.12 STS-24W (Intrepid)
- 1.13 STS-25W (Patriot)
- 1.14 STS-26W (Liberty)
- 1.15 STS-27W (Intrepid)
- 2 Space Transportation System Notation
ISA Western (STS-**W) notation
STS-13W (Patriot)
June 15 to July 1. ISS resupply using MPLM Michelangelo. First time two orbiters are docked at the ISS at once. First manned Russian orbiter flight (Baikal 2). Baikal to dock at Zvezda in place of Soyuz, Progress or ATV.
STS-14W (Liberty)
July 4 to August 1. Bravo construction flight (BCF-2). Slated to continue interior outfitting of external tank for manned use. Delivery of ET Station (ETS) Truss 1 elements and deployment of solar arrays. Pressurized Mating Adapter 1 launched with ET on 12W. Flight to last in excess of 26 days.
STS-15W (Constitution)
July 15-22. Launch of Callentine Climate Orbiter from Vandenberg AFB.
STS-16W (Intrepid)
August 12-19. First Intrepid flight; first launch from Launch Complex 39C at KSC. Planned launch of the Jupiter-Europa Explorer Probe (JEEP). Mission originally scheduled to launch Neptune-Triton Orbiter mission; mission later moved to Delta IV Heavy launcher.
STS-17W (Liberty)
August 26 to September 17. Bravo construction flight (BCF-3). Slated to continue interior outfitting of external tank for manned use. Delivery of Node 1 (Clarity) and PMA-2. Flight to last in excess of 23 days.
STS-18W (Terra Nova)
September 8-16. Launch of classified DoD satellite from Vandenberg AFB.
STS-19W (Patriot)
October 7-21. ISS resupply using MPLM Michelangelo.
STS-20W (Liberty)
October 25 to November 18. Bravo construction flight (BCF-4). Slated to continue or finalize interior outfitting of external tank for manned use. Delivery of the Venture airlock. Airlock to be attached to starboard of Clarity. Flight to last in excess of 25 days.
STS-21W (Constitution)
January 3-11, 2011. Launch of classified DoD satellite from Vandenberg AFB.
STS-22W (Patriot)
January 12 to February 2, 2011. Bravo construction flight (BCF-5). Slated to finalize interior outfitting of external tank for manned use. Delivery of Node 2 (Fidelity). Repositioning of PMA-2 from Clarity to Fidelity upon delivery. Flight to last in excess of 20 days.
STS-23W (Liberty)
February 7-27, 2011. Bravo construction flight (BCF-6). Delivery of the Centrifuge Accommodations Module. Module to be attached to port hatch of Clarity. Orion capsule expected to be launched for emergency use. Will be positioned at the nadir hatch of Clarity at PMA-3.
STS-24W (Intrepid)
March 14-29, 2011. Bravo Construction flight (BCF-7). Delivery of the TransHab module. Module to be attached to starboard hatch of Clarity. First Bravo crew.
STS-25W (Patriot)
April 2011. Bravo Construction flight (BCF-8). Delivery of the Pressurized Multipurpose Module Raffaello. Module to be attached to port of Fidelity. Module will allow for longer crew stays. First Automated Transfer Vehicle flight to Bravo.
STS-26W (Liberty)
May 2011. Bravo Construction flight (BCF-9). Possible delivery of Node 3. Mission will resupply the station should Node 3 be unable to fly.
STS-27W (Intrepid)
June 2011. Bravo Construction flight (BCF-10). Delivery of the Multi-Purpose Logistics Module Donatello containing additional supplies for station outfitting. Attached to nadir of Fidelity. Crew rotation. (Bravo 2)
Space Transportation System Notation
Following the retirement of the NASA shuttle fleet, the ISA will use the NASA notation system for all future shuttle flights, and will begin with STS-163.