Difference between revisions of "Space Shuttle Patriot"
Jump to navigation
Jump to search
Lafayette1 (talk | contribs) |
Lafayette1 (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| number = OV-109 | | number = OV-109 | ||
| country = United States | | country = United States | ||
− | | contract = July 31, | + | | contract = July 31, 2006 |
| cost = $2.9 billion (2008) | | cost = $2.9 billion (2008) | ||
| named_after = | | named_after = | ||
Line 19: | Line 19: | ||
| deployed = | | deployed = | ||
| dockings_mir = | | dockings_mir = | ||
− | | dockings_iss = | + | | dockings_iss = 1 |
| status = Active | | status = Active | ||
|}} | |}} | ||
Line 40: | Line 40: | ||
|- | |- | ||
| 2 | | 2 | ||
− | | | + | | 2010, NET March 10 |
| [[Orbital Contingency Test Flight]] | | [[Orbital Contingency Test Flight]] | ||
| In orbit linkup and test of [[Wikipedia:STS-3xx|Contingency Shuttle Crew Support]] and other orbital emergency procedures. | | In orbit linkup and test of [[Wikipedia:STS-3xx|Contingency Shuttle Crew Support]] and other orbital emergency procedures. | ||
|} | |} | ||
+ | |||
+ | ==External links== | ||
+ | * [http://science.ksc.nasa.gov/shuttle/missions/missions.html Mission Summary Archive] | ||
+ | * [http://lafayetteinc.com/index.php?title=Main_Page Shuttle Orbiter ''Patriot'' (OV-109)] | ||
+ | |||
+ | {{Space Shuttle Patriot}} | ||
+ | |||
+ | [[Category:Space Shuttles]] |
Latest revision as of 20:04, 18 October 2009
Patriot OV-109 | |
OV designation | OV-109 |
---|---|
Country | United States |
Contract award | July 31, 2006 |
Status | Active |
First flight | STS-6W October 7, 2009 |
ISS | 1 |
Space Shuttle Patriot (Orbiter Vehicle Designation: OV-109) is one of the three currently operational orbiters in the Space Shuttle fleet of the International Space Agency. (The others are Terra Nova and Constitution.)
Contents
History
Design
Flights
# | Launch date | Designation | Notes |
---|---|---|---|
1 | 2009, October 7 | STS-6W | First Patriot mission. First ISA mission to the International Space Station. |
2 | 2010, NET March 10 | Orbital Contingency Test Flight | In orbit linkup and test of Contingency Shuttle Crew Support and other orbital emergency procedures. |
External links
|
|